Notes:
7/17/2025 2:22:59 PM
7/18/2025 8:19:16 AM
1. Reconstruct sidewalk and drive aisle entrance on Coronel Avenue.
2. Construct new drive aisle and replace sidewalk for drive aisle work on Cabrillo Ave.
3. Remove and replace sidewalk to install sanitary tie in on Alhambra Ave.
7/18/2025 8:19:53 AM
Per Current Development:
Convert the construction work to a Sidewalk permit to be constructed per the set of approved building permit(s).
8/19/2025 11:52:14 AM
Sidewalk and Driveways to be restored per City of Vallejo Current Standards. Standard details are available on our website.
12/15/2025 11:26:20 AM
Per Bryan Little:
Justine, the elevation changes you are proposing are approved. The elevations being proposed must be inspected and approved by the City of Vallejo Public Works Inspectors in the field. All proposed path of travel must meet min. ADA Path of Travel requirements in the field. The proposed concrete installation form boards must be inspected and approved in the field before concrete placement
List all proposed Delta Changes on the field improvement plan set of construction drawings. Each Delta Change plan alteration needs to have a text explanation and a drawing proposed change.